City of Toronto: Online Call Documents
City of Toronto  
HomeContact UsHow Do I...?Advanced search

Living in TorontoDoing businessVisiting TorontoAccessing City Hall
*
CALL DOCUMENTS
Call documents
Call process
 
Construction Services
Goods and Services
Professional Services
Offer to Purchase
Divisional Request for Quotations
Addenda files
Search
 
TOOLS
Vendor registration system
Awarded contracts
Awarded contracts search
Sole source contracts
Viewing copy of call documents
Fees
 
RESOURCES
Doing business with the City
Construction specifications
FAQs
Public Notices
Policy & Legislation
Fair Wage Office
Purchasing links
Contact us
Complaints
 
 
   
Call Award Summary *
* *
  
Commodity:Construction Services, Road - Curb - Sidewalk
Description:Road Resurfacing of York Mills Road from Leslie Street to Don Mills Road
Bids are invited for Road Resurfacing of York Mills Road from Leslie Street to Don Mills Road, all in accordance with the provisions and specifications contained in the Request for Tender document, the City of Toronto's Procurement Policies, the Price / Pricing Form(s), the City of Toronto Fair Wage Policy and Labour Trades Contractual Obligations in the Construction Industry, and any other applicable policies.

All questions concerning this Tender should be directed in writing to Christina.Kysym@toronto.ca or fax (416) 397-7779.

The last day for questions with respect to this Tender is 3 working days before closing time and date. (For further details, refer to Section 2 of the Tender, Item 3. Questions)
Call AwardCall number: 155-2019
Successful bidder
and contract amount:
Sanscon Construction Limited
$1,765,589.99
Contract number:19ECS-TI-19MR
Date awarded:August 29, 2019
Client division:Engineering & Construction Services - Capital Works Delivery
Divisional contact:Michael PopikContact phone: 416-392-8487
Issue date:May 10, 2019Closing date:May 28, 2019
at 12:00 Noon
Revised
Notes:1 Addendum
155-2019 - NOIP - 19ECS-TI-19MR.pdf (175 Kbytes) - Posted on 05/10/2019 11:37:06 AM
155-2019 - Viewing Copy.pdf (9413 Kbytes) - Posted on 05/10/2019 11:38:53 AM
155-2019 - Addendum No. 1.pdf (88 Kbytes) - Posted on 05/24/2019 02:34:24 PM
Pre-bid meeting:No site meeting is required.
Buyer:Kysym, ChristinaPhone number:416-338-5926
Email:Christina.Kysym@toronto.caLocation:City Hall, 19th Floor, West Tower
Non-refundable document fee:
$100.00 + 25.00 + 16.25 HST = $141.25

Security deposit:

Yes

Hide details for Scope of work:Scope of work:

BID BOND: 10% of Bid Amount
CONTRACT NO. 19ECS-TI-19MR
NOTE:
This call document is available for purchase and download online on our website.
A non-refundable fee (shown above) in the form of Credit card, Debit card, cash or cheque payable to the Treasurer, City of Toronto, is required for each call document.

Drawings:

Tender Drawings are available on CD to purchasers of the tender document. Bidders must obtain a copy of the CD from the Tender Office of the Purchasing and Materials Management Division, 19th Floor, West Tower, City Hall, 100 Queen Street West, Toronto, during regular business hours (8:30 a.m. to 4:30 p.m.).
Proof of Tender purchase will be required to pick-up the CD. The vendors who have not purchased the Tender document will have to do so in order to obtain a copy of the CD.

SCOPE OF WORK:
• York Mills Road from Leslie Street to Don Mills Road, Ward 16 – Don Valley East
• Road Resurfacing of York Mills Road including replacement of deficient curbs, sidewalks and boulevards.
Completion Date
• It is anticipated this contract will commence on September 16th, 2019.

• This Contract, including all site restorations, clean up, and rectification of all known deficiencies, must be completed by no later than November 15th, 2019.

The project shall be divided into the following 2 phases:

Phase 1 - York Mills Road from Leslie Street to Don Mills Road
Phase 2 - York Mills Road from Lesmill to end


Phase 1 construction shall be divided into 5 stages as follows:
Stage 1 Curb, Sidewalk and boulevard work on north side of road
Stage 2 Mill and pave base asphalt in curb lane and middle lane on north side of road including base repairs
Stage 3 Curb, Sidewalk and boulevard work on south side of road
Stage 4 Mill and pave base asphalt in curb lane and middle lane on south side of road including base repairs
Stage 5 Utility adjustments and top asphalt paving

Phase 2 construction shall be divided into 2 stages as follows:
Stage 1 Curb and Sidewalk work on both sides of road
Stage 2 Utility adjustments, milling and paving of road


MANDATORY EXPERIENCE AND QUALIFICATIONS:

The Bidder must have the following experience in order to be considered for award:
• Must have completed a minimum of three similar linear infrastructure projects with a minimum value of $1 Million Canadian dollars each (excluding taxes). At least one of these projects must include municipal work including coordination with operations including tie in with existing systems.
• Certificate of Recognition (COR™) Requirement, or an Equivalent (such as ISO 45001) OHS Certification.




Privacy statement
© City of Toronto 1998-2020