City of Toronto: Online Call Documents
City of Toronto  
HomeContact UsHow Do I...?Advanced search

Living in TorontoDoing businessVisiting TorontoAccessing City Hall
*
CALL DOCUMENTS
Call documents
Call process
 
Construction Services
Goods and Services
Professional Services
Offer to Purchase
Divisional Request for Quotations
Addenda files
Search
 
TOOLS
Vendor registration system
Awarded contracts
Awarded contracts search
Sole source contracts
Viewing copy of call documents
Fees
 
RESOURCES
Doing business with the City
Construction specifications
FAQs
Public Notices
Policy & Legislation
Fair Wage Office
Purchasing links
Contact us
Complaints
 
 
   
Call Award Summary *
* *
  
Commodity:Construction Services, Construction Services
Description:F.G. Gardiner Expressway
Bids are invited for F.G. Gardiner Expressway – Substructure Rehabilitation of Twelve (12) Bents - Bents 120 to131 and Five (5) Piers – Piers GS2 to GS6, all in accordance with the provisions and specifications contained in the Request for Tender document, the City of Toronto's Procurement Policies, the Price / Pricing Form(s), the City of Toronto Fair Wage Policy and Labour Trades Contractual Obligations in the Construction Industry, and any other applicable policies.

All questions concerning this Tender should be directed in writing to Christina.Kysym@toronto.ca or fax (416) 397-7779.

The last day for questions with respect to this Tender is 3 working days before closing time and date. (For further details, refer to Section 2 of the Tender, Item 3. Questions)
Call AwardCall number: 48-2019
Successful bidder
and contract amount:
F.G. Gardiner Expressway
Grascan Construction Ltd
8,520,000.00
Contract number:19ECS-TI-01GE
Date awarded:May 2, 2019
Client division:Engineering & Construction Services - Capital Works Delivery
Issue date:February 1, 2019Closing date:March 13, 2019
at 12:00 Noon
Notes:3 Addenda
48-2019 - NOIP - 19ECS-TI-13LR_1.pdf (306 Kbytes) - Posted on 02/01/2019 03:11:55 PM
48-2019 - Viewing Copy.pdf (7970 Kbytes) - Posted on 02/01/2019 03:12:30 PM
48-2019 - Addendum No. 1.pdf (2074 Kbytes) - Posted on 02/20/2019 02:38:04 PM
48-2019 - Addendum No. 2.pdf (810 Kbytes) - Posted on 02/26/2019 10:38:54 AM
48-2019 - Addendum No. 3.pdf (2587 Kbytes) - Posted on 03/01/2019 03:45:31 PM
Pre-bid meeting:A mandatory site meeting will take place at 10:00AM local time on February 13, 2019.
Buyer:Kysym, ChristinaPhone number:416-338-5926
Email:Christina.Kysym@toronto.caLocation:City Hall, 19th Floor, West Tower
Non-refundable document fee:
$100.00 + 25.00 + 16.25 HST = $141.25

Security deposit:

Yes

Hide details for Scope of work:Scope of work:

All questions concerning this Tender should be directed in writing to Christina.Kysym@toronto.ca or fax (416) 397-7779.

The last day for questions with respect to this Tender is 3 working days before closing time and date. (For further details, refer to Section 2 of the Tender, Item 3. Questions)



BID BOND: 10% of Bid Amount
CONTRACT NO. 19ECS-TI-01GE
NOTE:
This call document is available for purchase and download online on our website.
A non-refundable fee (shown above) in the form of Credit card, Debit card, cash or cheque payable to the Treasurer, City of Toronto, is required for each call document.

Drawings:

Tender Drawings are available on CD to purchasers of the tender document. Bidders must obtain a copy of the CD from the Tender Office of the Purchasing and Materials Management Division, 19th Floor, West Tower, City Hall, 100 Queen Street West, Toronto, during regular business hours (8:30 a.m. to 4:30 p.m.).
Proof of Tender purchase will be required to pick-up the CD. The vendors who have not purchased the Tender document will have to do so in order to obtain a copy of the CD.

SCOPE OF WORK:

• F.G. Gardiner Expressway – Substructure Rehabilitation of Twelve (12) Bents – Bents 120 to131 and Five (5) Piers – Piers GS2 to GS6.
• F.G. Gardiner Expressway (Expressway) from west of Spadina Avenue to Lower Simcoe Street. The Project is located in Ward 10 Spadina – Fort York based on the 2018 ‘25 Ward’ boundaries.
• Work in this Contract comprises the repair of twelve (12) Bents (120-131) and five (5) Piers (GS2 – GS6) along the Expressway. This section of the Expressway is located west of Spadina Avenue to Lower Simcoe Street
• This work shall include, but not be limited to:
• Access and protection for the work;
• Removal of concrete in substructure (bents/piers);
• Concrete in the refacing (columns, cap beams and bearing seats) and patches;
• Dowels, reinforcing steel, and welded wire reinforcement;
• Surface sealing of the refacing concrete;
• Jacking temporary support of girders;
• The supply and installation of passive galvanic anode bars;
• Work to be undertaken also includes:
o Compliance with all laws, regulations, occupational health and safety, permits and all environmental requirements;
o Relocation, protection, maintenance, and reinstatement of all electrical and RESCU conduits, junction boxes and other components during the work;
o Coordination with all stakeholders, including utilities and RESCU; and
• Other miscellaneous works as identified in the Contract Documents.
• The project shall be divided into the following 2 phases:

Phase 1 - To be completed by July 5, 2019 (interim completion)
Phase 2 - To be completed by December 20, 2019 (final completion)

This Contract has two (2) sites of work as shown in the Contract Documents. Work shall proceed concurrently at both sites for both phases.

Phase 1 work is the work identified on the GS2 to GS6 Piers, just west of Simcoe Street, on the Rees Street on-ramp to eastbound F.G. Gardiner Expressway. This phase of the work shall be complete by the date identified above to mitigate impacts to the area during the summer months. Phase 1 completion date is the interim completion date.

Phase 2 is the work identified in the Contract Documents on Bents 120 to 131 (West of Spadina Avenue, beneath the F.G. Gardiner Expressway). This phase of the work shall be completed by the dates identified above.

It should be noted that elsewhere in the Contract Documents, liquidated damages will be applied to the interim (Phase 1) and final (Phase 2) completion dates.
Completion Date
This Contract, including all site restorations, clean up, and rectification of all known deficiencies, must be completed by no later than December 20, 2019.

The Contractor is to commence work within five (5) days of receiving a Notice of Order to Commence Work from the City.

MANDATORY EXPERIENCE AND QUALIFICATIONS:

The Bidder must have the following experience in order to be considered for award:

• 1. Must have completed, or must have achieved Substantial Completion within the meaning of the Construction Act for at least three (3) projects within the past ten (10) years as General Contractor involving bridge rehabilitation/improvement work on bridges in Ontario having a minimum dollar value of $8,000,000 Canadian Dollars each (excluding taxes). At least one of these projects must have involved staged/phased construction activities. Or,
• Must have completed a minimum of five (5) similar bridge infrastructure projects with a minimum value of $5,000,000 Canadian dollars each (excluding taxes).
• Certificate of Recognition (COR™) Requirement




Privacy statement
© City of Toronto 1998-2020