City of Toronto: Online Call Documents
City of Toronto  
HomeContact UsHow Do I...?Advanced search

Living in TorontoDoing businessVisiting TorontoAccessing City Hall
*
CALL DOCUMENTS
Call documents
Call process
 
Construction Services
Goods and Services
Professional Services
Offer to Purchase
Divisional Request for Quotations
Addenda files
Search
 
TOOLS
Vendor registration system
Awarded contracts
Awarded contracts search
Sole source contracts
Viewing copy of call documents
Fees
 
RESOURCES
Doing business with the City
Construction specifications
FAQs
Public Notices
Policy & Legislation
Fair Wage Office
Purchasing links
Contact us
Complaints
 
 
   
Call Award Summary *
* *
  
Commodity:Construction Services, Sewer repair and maintenance
Description:BASEMENT FLOODING PROTECTION PROGRAM, PHASE 4, ASSIGNMENT 14-05 Storm Sewer, Watermain and Related Improvements
For: BASEMENT FLOODING PROTECTION PROGRAM, PHASE 4, ASSIGNMENT 14-05

Storm Sewer, Watermain and Related Improvements on: Shoreham Drive, Jane Street, Gosford Boulevard, Hullmar Drive, York Gate Boulevard, Artech Court, Fletcherdon Crescent & Secroft Crescent
Call AwardCall number: 205-2018
Successful bidder
and contract amount:
BASEMENT FLOODING PROTECTION PROGRAM, PHASE 4, ASSIGNMENT 14-05 Storm Sewer, Watermain and Related Improvements
TACC Construction Ltd.
$13, 016,417.42
Contract number:18ECS-LU-11FP
Date awarded:March 6, 2019
Client division:Engineering & Construction Services - Capital Works Delivery
Issue date:October 11, 2018Closing date:November 16, 2018
at 12:00 Noon
Revised
Notes:5 Addenda
NOIP - Tender 205-2018 18ECS-LU-11FP.pdf (86 Kbytes) - Posted on 10/11/2018 09:34:56 AM
Summary Notice - Tender 205-2018 18ECS-LU-11FP.pdf (69 Kbytes) - Posted on 10/11/2018 09:36:13 AM
205-2018 18ECS-LU-11FP Viewing Copy.pdf (5521 Kbytes) - Posted on 10/11/2018 09:39:35 AM
2_18ECS-LU-11FP - Geotechnical Report 2016-03-18.PDF (6092 Kbytes) - Posted on 10/11/2018 09:40:17 AM
3_18ECS-LU-11FP - PTTW Hydrogeological Report 2016-05-06.PDF (5089 Kbytes) - Posted on 10/11/2018 09:40:48 AM
4_18ECS-LU-11FP - Prelim Hydrogeological Report 2016-03-01.PDF (7500 Kbytes) - Posted on 10/11/2018 09:41:29 AM
5_18ECS-LU-11FP -2018-09 IFT Drawings 1 of 3.pdf (7720 Kbytes) - Posted on 10/11/2018 09:42:20 AM
6_18ECS-LU-11FP -_2018-09 IFT Drawings 2 of 3.pdf (6509 Kbytes) - Posted on 10/11/2018 09:42:59 AM
7_18ECS-LU-11FP -2018-09 IFT Drawings 3 of 3.pdf (5431 Kbytes) - Posted on 10/11/2018 09:43:32 AM
Addendum 1 - Tender 205-2018.PDF (613 Kbytes) - Posted on 10/24/2018 11:21:38 AM
Addendum 2 - Tender 205-2018.PDF (703 Kbytes) - Posted on 11/02/2018 01:21:36 PM
Addendum 3 - Tender 205-2018.pdf (82 Kbytes) - Posted on 11/07/2018 10:55:07 AM
Addendum 4 - Tender 205-2018.pdf (92 Kbytes) - Posted on 11/09/2018 02:10:04 PM
Addendum 5 - Tender 205-2018.PDF (308 Kbytes) - Posted on 11/12/2018 04:25:27 PM
Buyer:Yang, AimeePhone number:416-397-4803
Email:Aimee.Yang@toronto.caLocation:City Hall, 19th Floor West Tower
Non-refundable document fee:
$100.00 + 13.00 HST = $113.00

Hide details for Scope of work:Scope of work:

Specific mandatory requirements as outlined in Section 2 and Section 3 of the contract document;

A. Within the past seven (7) years, bidders must have completed projects with the following requirements:
1. Minimum of 3 projects with construction works in urban settings, with the locations identified.
2. Minimum of 2 project(s) with installation of large diameter sewers (>1500 mm diameter).
3. Minimum of 2 project(s) with installation of sewers at minimum 7 m depth or greater.
4. Minimum of 2 watermain projects (>250 mm diameter), including water services installation.
5. Minimum of 2 projects of at least $13 million each in final Contract Price (excluding tax) with two (2) of the following three (3) work types: sewers, watermains and transportation road work.
6. Minimum of 2 construction project(s) in type 4 soils (as classified in O. Reg. 213/91, s. 226 (5)) requiring support structures for construction.
7. Minimum of 3 road surface restoration or transportation work projects.

B. Mandatory experience requirements for key staff (project managers and superintendents) are as follows:

Role:

• Project Manager
o Minimum ten (10) years relevant experience in project management
o Degree in engineering

• Site Superintendents
Minimum two (2) superintendents on staff:
o One with minimum fifteen (15) years relevant experience
o Second with minimum ten (10) years relevant experience




Privacy statement
© City of Toronto 1998-2020