City of Toronto: Online Call Documents
City of Toronto  
HomeContact UsHow Do I...?Advanced search

Living in TorontoDoing businessVisiting TorontoAccessing City Hall
*
CALL DOCUMENTS
Call documents
Call process
 
Construction Services
Goods and Services
Professional Services
Offer to Purchase
Divisional Request for Quotations
Addenda files
Search
 
TOOLS
Vendor registration system
Awarded contracts
Awarded contracts search
Sole source contracts
Viewing copy of call documents
Fees
 
RESOURCES
Doing business with the City
Construction specifications
FAQs
Public Notices
Policy & Legislation
Fair Wage Office
Purchasing links
Contact us
Complaints
 
 
   
Call Award Summary *
* *
  
Commodity:Construction Services, Sewer repair and maintenance
Description:West Don Sanitary Trunk Sewer and Maintenance Holes Rehabilitation
West Don Sanitary Trunk Sewer and Maintenance Holes Rehabilitation Between MH132-068-1 and MH132-072-1 and North Toronto Sanitary Trunk Sewer Spot Repair of Local Sewer Connection from MH 125-009-1 to MH125-010-1
Call AwardCall number: 184-2018
Successful bidder
and contract amount:
West Don Sanitary Trunk Sewer and Maintenance Holes Rehabilitation
Clean Water Works Inc.
$6,975,266.54
Contract number:17ECS-LU-03TT
Date awarded:January 8, 2019
Client division:Engineering & Construction Services - Engineering Services
Issue date:August 30, 2018Closing date:October 3, 2018
at 12:00 Noon
Revised
Notes:5 Addenda
Tender 184-2018 -Notice_intended_procurement.pdf (61 Kbytes) - Posted on 08/30/2018 10:05:09 AM
184-2018 Viewing Copy.pdf (2422 Kbytes) - Posted on 08/30/2018 10:05:54 AM
Addendum 1.pdf (449 Kbytes) - Posted on 09/18/2018 05:41:40 PM
Addendum 1 Attachment Pricing Form.pdf (271 Kbytes) - Posted on 09/18/2018 05:42:23 PM
Addendum 1 Attachment ArboristReport.pdf (4967 Kbytes) - Posted on 09/18/2018 05:43:19 PM
Addendum 1 Attachment EIS Part 1A.pdf (2760 Kbytes) - Posted on 09/18/2018 07:11:21 PM
Addendum 1 Attachment EIS Part 1B.1.pdf (4813 Kbytes) - Posted on 09/18/2018 07:17:43 PM
Addendum 1 Attachment EIS Part 1B.2.pdf (9156 Kbytes) - Posted on 09/18/2018 07:21:37 PM
Addendum 1 Attachment EIS Part 2.pdf (9542 Kbytes) - Posted on 09/18/2018 07:23:09 PM
Addendum 1 Attachment EIS Part 3A.1.pdf (4025 Kbytes) - Posted on 09/18/2018 07:34:17 PM
Addendum 1 Attachment EIS Part 3A.2.pdf (6372 Kbytes) - Posted on 09/18/2018 07:35:10 PM
Addendum 1 Attachment EIS Part 3B.pdf (6825 Kbytes) - Posted on 09/18/2018 07:36:53 PM
Addendum 1 Attachment EIS Part 4A.pdf (9426 Kbytes) - Posted on 09/18/2018 07:45:35 PM
Addendum 1 Attachment EIS Part 4B.pdf (5416 Kbytes) - Posted on 09/18/2018 07:46:29 PM
Addendum 2 - Tender184-2018.PDF (1166 Kbytes) - Posted on 09/20/2018 04:54:44 PM
Addendum 3 -Tender 184-2018.PDF (79 Kbytes) - Posted on 09/26/2018 01:03:44 PM
Addendum 4 - Tender 184-2018.pdf (182 Kbytes) - Posted on 09/28/2018 12:28:46 PM
Addendum 4 Attachment 1 - Pricing Form .pdf (287 Kbytes) - Posted on 09/28/2018 12:29:24 PM
Addendum 4 Attachment 2 - PTTW Hydrogeological Report TT163027 - West DonSTS_fullPart-1.pdf (6857 Kbytes) - Posted on 09/28/2018 12:29:59 PM
Addendum 4 Attachment 3 - PTTW Hydrogeological Report TT163027 - West DonSTS_fullPart-2.pdf (4085 Kbytes) - Posted on 09/28/2018 12:30:33 PM
Addendum 4 Attachment 4 - PTTW Hydrogeological Report TT163027 - West DonSTS_fullPart-3.pdf (4322 Kbytes) - Posted on 09/28/2018 12:31:09 PM
Addendum 5.pdf (91 Kbytes) - Posted on 10/01/2018 01:19:53 PM
Pre-bid meeting:Optional site meeting to be held on: September 10, 2018 at 10AM at 4070 Yonge Street – Service Yard – Don Valley Golf Course, North York
Buyer:Reid, MariePhone number:416-397-5187
Email:Marie.Reid@toronto.caLocation:City Hall, 19th Floor West Tower
Non-refundable document fee:
$100.00 + 25.00 + 16.25 HST = $141.25

Security deposit:

Yes

Hide details for Scope of work:Scope of work:

Bid Bond Amount: 10% of Total Bid Amount

Contract No.: 17ECS-LU-03TT

NOTE: Appendices are provided in a USB flash drive format and USB is available for pick up at the Purchasing & Materials Management Division Tender Office, located on the 19th Floor, West Tower, City Hall, 100 Queen Street West, Toronto ON at no additional cost. Please provide your online proof of purchase.

Scope of Work:

A portion of West Don Sanitary Trunk Sewer (West Don STS), located within the ravine section of the Don River West Branch near Yonge Street at York Mills requires rehabilitation. The sewer pipe is approximately 736 m length and 1,200 mm in diameter. Its northern portion is within City owned Don Valley Golf Course and continues in a south eastern direction along the Don River crossing beneath Wilson Avenue and Yonge Street and ends east of York Mills Subway Station. One sewer section crossing the Don River is twin 750mm diameter pipe.

A single section of North Toronto Sanitary Trunk Sewer (North Toronto STS), located along the Lower Don River Trail on the south side of the Don River requires rehabilitation. The project limit starts approximately at the access from Beechwood Drive to the trail and ends west of Millwood Road Bridge.

The Work includes, but is not limited to, the following:
• Sanitary Trunk Sewer rehabilitation
• Maintenance Hole construction, replacement/ rehabilitation
• Restoration works including golf course reinstatement, pavement, landscaping, tree restoration
• Temporary By-pass pumping including the installation of an access bridge and a pipe bridge across West Don River.

For more information on this call, please refer to the viewing copy attachment in the Notes section above.




Privacy statement
© City of Toronto 1998-2020