City of Toronto: Online Call Documents
City of Toronto  
HomeContact UsHow Do I...?Advanced search

Living in TorontoDoing businessVisiting TorontoAccessing City Hall
*
CALL DOCUMENTS
Construction Services
Goods and Services
Professional Services
Offer to Purchase
Divisional Request for Quotations
Search
 
TOOLS
Supplier registration for Solicitation Summaries and NOIP
Awarded contracts
Awarded contracts search
Non-Competitive contracts
 
RESOURCES
Doing business with the City
Construction specifications
FAQs
Public Notices
Policy & Legislation
Fair Wage Office
Purchasing links
Contact us
Complaints
 
 
   
Call Award Summary *
* *
  
Commodity:Construction Services, Construction Services
Description:Progress Avenue Underpass (at McCowan Road) - Replacement of Barrier Wall End Treatments and Miscellaneous Repairs
Bids are invited for Progress Avenue Underpass (at McCowan Road) - Replacement of Barrier Wall End Treatments and Miscellaneous Repairs, all in accordance with the provisions and specifications contained in the Request for Tender document, the City of Toronto's Procurement Policies, the Price / Pricing Form(s), the City of Toronto Fair Wage Policy and Labour Trades Contractual Obligations in the Construction Industry, and any other applicable policies.

All questions concerning this Tender should be directed in writing to Christina.Kysym@toronto.ca or fax (416) 397-7779.

The last day for questions with respect to this Tender is 3 working days before closing time and date. (For further details, refer to Section 2 of the Tender, Item 3. Questions)
Call AwardCall number: 96-2019
Successful bidder
and contract amount:
Marbridge Construction Ltd.
$762,007.20
Contract number:19ECS-TI-14BE
Date awarded:June 19, 2019
Client division:Engineering & Construction Services - Capital Works Delivery
Divisional contact:Negar KhalvatiContact phone: 416-392-4362
Issue date:April 1, 2019Closing date:April 30, 2019
at 12:00 Noon
Revised
Notes:2 Addenda
96-2019 - Viewing Copy.pdf (4888 Kbytes) - Posted on 04/01/2019 01:05:12 PM
96-2019 - NOIP - 19ECS-TI-14BE.pdf (276 Kbytes) - Posted on 04/01/2019 01:07:44 PM
96-2019 - Addendum No. 1.pdf (240 Kbytes) - Posted on 04/09/2019 02:23:34 PM
96-2019 - Addendum No. 2.pdf (2464 Kbytes) - Posted on 04/17/2019 01:53:38 PM
Pre-bid meeting:Mandatory Site meeting:

Tuesday April 9, 2019 - 10:00am at the west end of the canopy.
Buyer:Kysym, ChristinaPhone number:416-338-5926
Email:Christina.Kysym@toronto.caLocation:City Hall, 19th Floor, West Tower
Non-refundable document fee:
$100.00 + 25.00 + 16.25 HST = $141.25

Security deposit:

Yes

Hide details for Scope of work:Scope of work:

BID BOND: 10% of Bid Amount
CONTRACT NO. 19ECS-TI-14BE
NOTE:
This call document is available for purchase and download online on our website.
A non-refundable fee (shown above) in the form of Credit card, Debit card, cash or cheque payable to the Treasurer, City of Toronto, is required for each call document.

Drawings:

Tender Drawings are available on CD to purchasers of the tender document. Bidders must obtain a copy of the CD from the Tender Office of the Purchasing and Materials Management Division, 19th Floor, West Tower, City Hall, 100 Queen Street West, Toronto, during regular business hours (8:30 a.m. to 4:30 p.m.).
Proof of Tender purchase will be required to pick-up the CD. The vendors who have not purchased the Tender document will have to do so in order to obtain a copy of the CD.

SCOPE OF WORK:
This Contract entails Replacement of Barrier Wall End Treatments and Miscellaneous Repairs on Progress Avenue Underpass (at McCowan Road); including staged construction, temporary traffic control, excavation and backfilling, partial and full depth concrete removal, removal of concrete barrier wall, installation of permanent energy attenuators, repair of original pedestrian enclosure, pressure washing of existing enclosure, installation of guide rail, site restoration and other miscellaneous repairs.
The project shall be divided into the following construction stages (only general work items listed; refer to Contract Documents for further details)

Stage 1A Install Stage 1A temporary traffic control; and
Remove Existing Guide Rail and Install new steel beam guide rail at Progress Ave. W-N ramp onto McCowan Rd.
Stage 1B Install Stage 1B temporary traffic control;
Remove concrete barrier and sidewalk at northeast quadrant;
Construct new concrete barrier at northeast quadrant;
Install energy attenuator at northeast quadrant;
Remove pedestrian crossing west of the bridge; and
Construct new concrete sidewalk at northeast quadrant.
Stage 2 Install Stage 2 temporary traffic control;
Remove concrete barrier, concrete curb and gutter and paving stones;
Construct new concrete barrier;
Install energy attenuator;
Construct new depressed concrete curb and gutter;
Reinstate paving stones;
Concrete removal – partial depth as directed by the Contract Administrator;
Removal and reconstruction of top of barrier wall concrete;
Handrail repairs at staircases;
Repairs to existing pedestrian enclosure.
Demobilization Reinstate site to pre-construction conditions or better as approved by contract administrator; and
Demobilize from site.

Completion Date
This Contract, including all site restorations, clean up, and rectification of all known deficiencies, must be completed in no more than 40 working days, which shall be counted from the date of commencement of the site work. The Contract Time shall be 40 working days. The Contractor shall commence work within five (5) days of receiving an “Order to Commence Site Work” from the Contract Administrator and work in a continuous manner with sufficient intensity of effort and manpower to achieve the completion of the project within the working days specified.
Completion shall be deemed to have occurred when the criteria in s. 2(3) of the Construction Lien Act have been met, and, for clarity, shall include the removal of all temporary facilities and items (site trailer, washroom facilities, etc.) from the Working Area, within the City of Toronto's Right-of-Way.

MANDATORY EXPERIENCE AND QUALIFICATIONS:

The Bidder must have the following experience in order to be considered for award:

1. In the past five (5) years, the Bidder must have successfully completed, as the General Contractor as defined in Construction Lien Act:
a) at least (2) bridge projects with each project having a value in excess of $2,000,000 Canadian Dollars (excluding HST); or

b) Three (3) bridge projects, with an aggregate value of $5,000,000 CAD (excluding HST) total , each with a value in excess of $1,500,000 CAD (excluding HST).

2. At least one of the above projects should involve bridge rehabilitation/improvement work on an arterial roadway.
3. The Bidder and/or subcontractor for the repairs of the pedestrian enclosure must have successfully completed at least two (2) curtain wall manufacturing and design project with value in excess of $300,000 and must have a minimum of 5 years’ experience in curtain wall manufacturing, design and installation.
• Certificate of Recognition (COR™) Requirement, or an Equivalent (such as ISO 45001) OHS Certification.