City of Toronto: Online Call Documents
City of Toronto  
HomeContact UsHow Do I...?Advanced search

Living in TorontoDoing businessVisiting TorontoAccessing City Hall
*
CALL DOCUMENTS
Call documents
Call process
 
Construction Services
Goods and Services
Professional Services
Offer to Purchase
Divisional Request for Quotations
Addenda files
Search
 
TOOLS
Vendor registration system
Awarded contracts
Awarded contracts search
Sole source contracts
Viewing copy of call documents
Fees
 
RESOURCES
Doing business with the City
Construction specifications
FAQs
Public Notices
Policy & Legislation
Fair Wage Office
Purchasing links
Contact us
Complaints
 
 
   
Call Award Summary *
* *
  
Commodity:Construction Services, Watermains - Water Services
Description:Watermain, and substandard water service replacements
Bids are invited for Watermain, and substandard water service replacements on various streets in Scarborough and North York District, including local road resurfacing on Pell Street, and local road reconstruction on Whitburn Avenue and Pickering Street, all in accordance with the provisions and specifications contained in the Request for Tender document, the City of Toronto's Procurement Policies, the Price / Pricing Form(s), the City of Toronto Fair Wage Policy and Labour Trades Contractual Obligations in the Construction Industry, and any other applicable policies.

All questions concerning this Tender should be directed in writing to Brenda.Duffley@toronto.ca or fax (416) 397-7779.

The last day for questions with respect to this Tender is 3 working days before closing time and date. (For further details, refer to Section 2 of the Tender, Item 3. Questions).
Call AwardCall number: 5-2019
Successful bidder
and contract amount:
2489960 Ontario Ltd.
$11,666,571.31
Date awarded:August 8, 2019
Client division:Engineering & Construction Services - Engineering Services
Divisional contact:Dennis CoronelContact phone: 416-338-5541
Issue date:March 19, 2019Closing date:April 15, 2019
at 12:00 Noon
Revised
Notes:3 Addenda
5-2019 Viewing Copy Only.pdf (3288 Kbytes) - Posted on 03/19/2019 01:56:57 PM
5-2019 - Addendum 1.pdf (866 Kbytes) - Posted on 04/05/2019 03:45:39 PM
5-2019 - Addendum 1 - Drawings Set 1 of 2.pdf (6890 Kbytes) - Posted on 04/05/2019 03:46:19 PM
5-2019 - Addendum 1 - Drawings Set 2 of 2.pdf (7589 Kbytes) - Posted on 04/05/2019 03:46:54 PM
5-2019 Addendum No. 2.pdf (27 Kbytes) - Posted on 04/10/2019 10:54:23 AM
5-2019 Addendum No. 3.pdf (911 Kbytes) - Posted on 04/11/2019 01:12:00 PM
Pre-bid meeting:N/A
Buyer:Duffley, BrendaPhone number:416-338-5575
Email:Brenda.Duffley@toronto.caLocation:City Hall, 19th Floor West Tower
Non-refundable document fee:
$100.00 + 25.00 + 16.25 HST = $141.25

Hide details for Scope of work:Scope of work:

Scope of Work:

BID BOND: 4% of Bid Amount
CONTRACT NO. 19ECS-LU-06SU

NOTE:

This call document is available for purchase and download online on our website.
Please see the attachments posted on our website.

Drawings:

Tender Drawings are available on CD to purchasers of the tender document. Bidders must obtain a copy of the CD from the Tender Office of the Purchasing and Materials Management Division, 19th Floor, West Tower, City Hall, 100 Queen Street West, Toronto, during regular business hours (8:30 a.m. to 4:30 p.m.).
Proof of Tender purchase will be required to pick-up the CD. The vendors who have not purchased the Tender document will have to do so in order to obtain a copy of the CD.

SCOPE OF WORK:

• In general the work to be completed on Fairview Mall Drive includes:
o Replacement of 267 m of existing 250 mm watermain from Don Mills Road to Godstone Road with new 300 mm watermain
o Transfer all water services to new 300 mm watermain.
o Replacement of all substandard water service.

• In general the work to be completed on Finch Avenue East includes:
o Replacement of 398 m of existing 300 mm watermain from Cherokee Boulevard to Gordon Baker Road by horizontal direction drilling.

• In general the work to be completed on Galbraith Avenue includes:
o Abandon the 410 m of existing 150 mm watermain from Westview Boulevard to Glenburn Avenue.
o Installation of 210 m of new 300 mm watermain from Glenburn Avenue to Victoria Park.
o Transfer all water services to existing and new 300 mm watermain.
o Replacement of all substandard water service from Glenburn Avenue to Victoria Park Avenue.

• In general the work to be completed on Godstone Road includes:
o Replacement of 88 m of existing 250 mm watermain from Fairview Mall Drive to Kingslake Road with new 300 mm watermain
o Transfer all water services to new 300 mm watermain.
o Replacement of all substandard water service.

• In general the work to be completed on Granard Boulevard includes:
o Replacement of 329 m of existing 150 mm watermain from Adanac Drive to Bellamy Road South by horizontal direction drilling.
o Transfer all water services to new 150 mm watermain.
o Replacement of all substandard water service.

• In general the work to be completed on Old Leslie Street includes:
o Replacement of 200 m of existing 300 mm watermain from Sheppard Avenue East to the East side of the CNR/Metrolinx tracks.
o Transfer all water services to new 300 mm watermain.
o Replacement of all substandard water service.

• In general the work to be completed on Pell Street includes:
o Replacement of 303 m of existing 150 mm watermain from Sandown Avenue to Ridgemoor Avenue.
o Transfer all water services to new 150 mm watermain.
o Replacement of all substandard water service.
o Local road resurfacing of 303 m of roadway from Sandown Avenue to Ridgemoor Avenue.

• In general the work to be completed on Pickering Street includes:
o Replacement of 610 m of existing 100/150 mm watermain from Gerrard Street to Kingston Road with new 300 mm watermain
o Transfer all water services to new 300 mm watermain.
o Replacement of all substandard water service.
o Local road reconstruction of 610 m of roadway from Gerrard Street to Kingston Road.

• In general the work to be completed on Duvernet Avenue includes:
o Installation of temporary water supply.
o Replacement of 190 m of existing 150 mm watermain from Golfview Avenue to Woodbine Avenue in the same location as the existing.
o Transfer all water services to new 150 mm watermain.
o Replacement of all substandard water service.

• In general the work to be completed on Whitburn Crescent includes:
o Replacement of 860 m of existing 150 mm watermain from Keele Street to Blaydon Avenue (North intersection)
o Transfer all water services to new 150 mm watermain.
o Replacement of all substandard water service.
o Local road reconstruction of 660 m of roadway from Blaydon Avenue to Blaydon Avenue

This Contract, including all site restorations, clean up, and rectification of all known deficiencies, must be completed within 161 Working Days from the date of commencement of the Work.

MANDATORY EXPERIENCE AND QUALIFICATIONS:

The Bidder must have the following experience in order to be considered for award:

1. The Bidder shall provide three (3) project examples for work completed between 2016 and 2018. Two of these three examples must show experience with contract values each exceeding five million dollars net, and linear infrastructure type work in an urban environment, including coordination with City of Toronto operations and tie in with existing systems.

2. The Bidder shall provide verifiable evidence of the completion of least 5,000 metres total of watermain and / or sewer installation between 2016 and 2018.




Privacy statement
© City of Toronto 1998-2020